Wastewater Management Authority
Wastewater Management Authority (WMA), established in 2000, under the Wastewater Management Authority Act 2000 operates under the aegis of the Ministry of Energy and Public Utilities. The core service of the WMA is the collection and treatment of domestic, commercial and industrial wastewaters for disposal to an environmentally acceptable quality, ensuring the country's sustainable development through the provision of appropriate water pollution standards, wastewater control systems and management services to the entire population of Mauritius. Being responsible for the wastewater sector in Mauritius, WMA manages the public wastewater system, which consists of 591 km of sewer network, 72 pumping stations and 10 treatment plants, including 4 main treatment plants which are located at St Martin, GrandBaie, Baie-du-Tombeau, and Montagne Jacquot. In order to sustain its rapid economic growth and preserve the country's fragile environment, Mauritius has to address environmental issues related to demographic growth and rapid changes in the use of water and land resources. In 2012, Government approved new Master Plan 2014-2033. The objective of the plan is to elaborate a programme for the development and management of waste water in Mauritius for a period of 20 years 2014-2033.
For more information, please visit the website of CWA : https://www.wmamauritius.mu/
Projects by WMA
Major Projects of the Wastewater Management Authority
1. Grand Baie Sewerage Project-Phase I B (Contract WW302W) - Works Contract
Region: Péreybère to Cap Malheureux
No of House Connections: 4500
Funding: Japan International Cooperation Agency (JICA)
Status: Ongoing
Target date for implementation: 19 August 2019 - 19 March 2023
Cost of Project: MUR 2,401 Million (Incl VAT)
2. Grand Baie Sewerage Project-Phase I B (Contract WW230C) - Consultancy Services for Surveys, Detailed Design, Preparation of Bidding Documents and Supervision of the Works
Region: Péreybère to Cap Malheureux
No of House Connections: 4500
Funding: Japan International Cooperation Agency (JICA)
Status: Ongoing
Target date for implementation: scheduled for completion on 19 March 2023
Cost of Project: Rs 177,971,457.35 (Incl VAT)
3. West Coast Sewerage Project – Contract WW209R
Region: Albion to Grande Riviere Noire
No. of House Connections: House connections to be determined after feasibility study
Status: Feasibility study stage.
Target Date for implementation: Depending on funding available
Cost of project: Not yet determined
4. Pailles Guibies Sewerage Project – Phase II – Contract WW260W
Region: Pailles and Les Guibies
No. of House Connections: 3000
Funding: Government of Mauritius
Status: works ongoing
Target Date for implementation: 11 September 2019 – 10 January 2023
Cost of project: MUR 980M (Incl.VAT)
5. Rehabilitation/provision of Sewerage Infrastructure at Residence Atlee, Curepipe – CHA Phase IV – Contract WW 351W
Region: Residence Atlée, Derby Street, Gustave Collin Street, Les Casernes & Vicinity
No. of House Connections: 607
Funding: Government of Mauritius
Status: Bidding Documents are being finalised
Target Date for implementation: Tentative award by August 2020 for completion by August 2022
Cost of Project: MUR 137 M (Incl. VAT)
Duration: 24 Months
6. Sewerage Project at Camp Rouillard - Contract WW 334W
Region: Camp Rouillard
No. of House Connections: 200
Funding: Government of Mauritius
Status: Bids under evaluation at CPB
Target Date for implementation: Tentative award by June 2020 for completion by June 2022
Cost of Project: MUR 150 M (Incl. VAT)
Duration: 24 months
7. Sewerage Project at Morcellement Goolamally - Contract WW 369W
Region: Morcellement Goolamally, Terre Rouge
No. of House Connections: 225
Funding: Government of Mauritius
Status: Bidding Documents are being finalised
Tentative award; August 2020
Duration: 24 Months
Completion: August 2022
Cost of Project: 135.7 M (Incl. VAT)
Other projects
8. Valentina Sewerage Project – Contract WW389W
Region: Valentina
No. of House Connections: 75
Funding: Government of Mauritius
Status: works ongoing
Target Date for implementation: Completion by December 2020
Cost of project: MUR 25.5 Million (Incl. VAT)
9. Upgrading of sewers from Junction J. Nehru and Edgar Quirin Road to S. Hossen – Contract WW424W
Region: St Paul
Funding: Government of Mauritius
Status: works on going
Target Date for implementation: Tentatively August 2020
Cost of project: MUR 30 Million (Incl. VAT)
10. Rehabilitation / Provision of sewerage infrastructure at Residence Malherbes B – Contract WW331W
Region: Malherbes B
Funding: Government of Mauritius
Status: works on going
Target Date for implementation: To be completed in July 2020
Cost of project: MUR 52.3 Million (Incl. VAT)
11. Sewerage Project at Camp Caval and Robinson - Contract WW 226C
Region: Camp Caval and Robinson, Curepipe
No. of House Connections:
Funding: Government of Mauritius
Status: Bidding Documents for Consultancy Services are being prepared
Target Date for implementation: Tentative award for Consultancy services by December 2020
Cost of Project: MUR 18 million (Incl. VAT)
12. Residence Rivière du Rempart
Region(s): Rivière du Rempart
Length of Sewer: 570m
No of House Connections: 75
Funding: Government of Mauritius
Status: Feasibility Study and Detailed Design completed and presently under contract closure.
Cost of Project: - Lump Sum of MUR 2,990,000.00 (VAT inclusive) and Provisional Sum of MUR 1,150,000 (VAT inclusive)
House Connection Projects
13. FRAMEWORK AGREEMENT - Contract WW380W – Design and Construction of House Connections in the Sewered areas of Mauritius.
Region(s): Sewered areas in Mauritius
Length of Sewer: N.A
No of House Connections: 500 Approx. (Per Year)
Funding: Government of Mauritius
Status: Ongoing.
Cost of Project: - 90 Million
14. FRAMEWORK AGREEMENT - Contract WW381W – Sewer Extension works and Sewer Maintenance Work
Region(s): Sewered areas in Mauritius
Length of Sewer: N.A
No of House Connections: N.A
Funding: Government of Mauritius
Status: Ongoing.
Cost of Project: - 90 Million
15. Contract WW 335 - Residence Sadally Sewerage Project
Region(s): Residence Sadally, Vacoas
Length of Sewer: 150m of street sewer and 410m sewer in service corridors
No of House Connections: 60
Funding: Government of Mauritius
Status: Defects Liability Period
Cost of Project: - 15,057,742.35 (VAT inclusive)
16. Contract WW427W – Construction of rising main and associated works for ENT Hospital at Vacoas.
Region(s): Vacoas
Length of Sewer: 445 m of 110mm diameter rising main and 20m of gravity pipe
No of House Connections: 1
Funding: Government of Mauritius
Status: Reinstatement works ongoing
Cost of Project: - 5,380,290.35 (VAT inclusive)
17. Contract WW432W – Sewer Extension Works
Region(s): Phoenix, Quatre Bornes and Port Louis
Length of Sewer: 1505 m
No of House Connections: NA
Funding: Government of Mauritius
Status: Ongoing
Cost of Project: - MUR 18,051,947.86 (VAT inclusive)