Wastewater Sector

 
 

 
Major Projects:
      1. Grand Baie Sewerage Project-Phase I B (Contract WW302W)
·            Region: Péreybère and Cap Malheureux
·         No of House Connections: 5,500
·         Funding: Japan International Cooperation Agency (JICA)
·         Status: Application from Contractors being appraised
·         Target date for implementation: May 2017
·         Cost of Project: Rs 2760 M (Incl VAT)
 

        2.  Grand Baie Sewerage Project-Phase I B (Contract WW230C)

·         Region: Péreybère, Pointe Aux Cannoniers
·         No of House Connections: 1,600
·         Funding: Japan International Cooperation Agency (JICA)
·         Status: Ongoing
·         Target date for implementation: October 2013
·         Cost of Project: Rs 177,971,457.35 (Incl VAT)
 
3.      West Coast Sewerage Project
·         Region: Albion to Grand Rivière Noire
·         No of House Connections: House connections will be determined after feasibility study.
·         Status: Consultancy Stage
·         Target date for implementation: 2020
·         Cost of Project: Not yet determined
 
4.      Pailles-Guibies Sewerage Project Phase II
·         Funding by: Government of Mauritius
·         Status: Bidding documents are being finalised. 
·         Expected to be awarded in early 2018
·         Consultancy: -
·         Works: -
·         Estimated costs start: -
·         Targeted date for implementation: Jan 2018
·         Duration of Works: 30 months
 
Other Projects:
5.      Bain Des Dames Sewerage Project
·         Region: Within the unsewered pocket of Bain des Dames.
·         No of House Connections: 300
·         Funding: Government of Mauritius
·         Status: Preliminary design completed
·         Target date for implementation: 2018
·         Cost of Project: MUR 170 M (incl.VAT)
 
6.      Camp Caval and Robinson Sewerage Project
·         Region: Camp Cavale and Robinson.
·         No of House Connections: 1,100
·         Funding: Government of Mauritius
·         Status: Completed
·         Target date for implementation: Sept 2013
·         Cost of Project: MUR 5,208,750 (Incl. VAT)
 
7.      Vallée Des Prêtres and Tranquebar Sewerage Project
·         Region: Within the unsewered pockets of Vallée des Prêtres and Tranquebar
·         No of House Connections: 200
·         Funding: Government of Mauritius
·         Status: Consultancy Stage
·         Target date for implementation: July 2017
·         Cost of Project: MUR 226 M
 
8.      Pointe aux Sables Sewerage Project
·         Region: Terrasson, Cité Débarcadère, Pointe aux Sables, Petite Verger Prison, Petite Verger, Kensington place
·         No of House Connections: 4,000
·         Funding: To be secured
·         Status: Feasibility Study
·         Target date for start and completion: -
·         Cost of Project: -
 
9.      Plaines Wilhems Sewerage Project – Lot 1A
·         Region(s): The project covers the regions West Rose Hill, South West and Central Quatre Bornes.
·         Length of Sewer: 142 km of street sewer
·         No of House Connection: 12,000
·         Funding: European Investment Bank/Government of Mauritius
·         Status: Ongoing
·         Cost of Project: MUR 3.152 Billion
 
10.  Pailles-Guibies Sewerage Project  
·         Region(s):The project covers regions of Bonnefin Road, Michael Leal, Guibies, Morcellement Anse Courtois (Morcellement Bangladesh), Morcellement Raffray, Morcellement Fon Sing, Morcellement Le Roc, Domaine St Louis, Cite Mon Plaisir, Pailles Road, Camp Chapelon, Cite Jonction, Roshan Road, Cite St Louis, Pont St Louis, Cite La Butte, Cite Pailles Junction, Cite Mauvillac, Grand River North West, Canal Dayot.
·         Length of Sewer: 4 Km Trunk Sewer with the Construction of 1 Pumping Station
·         No of House Connections:  3,000
·         Funding: (Phase I): Arab Bank for Economic Development in Africa (BADEA)/ OPEC Fund for International Development (OFID)
·         Status: 30% of works completed (survey works completed and clearing of site is ongoing)
·         Target date for completion: End of October 2017
·         Cost of Project: 253 M
 
11.  Parisot Sewerage Project
·         Region: The vicinity of Parisot Road, namely in CTR Lane, Père Laval Lane, H.A.L Dhuny Lane and A.B Dhuny Lane.
·         Length of Sewer: 2.5 Km
·         No of House Connections: 250
·         Funding: Government of Mauritius
·         Target date for implementation: 30 September 2015
·         Cost of Project: 70,754,699.64 (inclusive of VAT)
 

       12. Verger Bissambar Sewerage Project 14. Verger Bissambar Sewerage Project

·         Region: The region of Verger Bissambar is a small unsewered pocket found in Beau Bassin, adjacent to the Beau Bassin Prison.
·         Length of Sewer: 2.8 Km
·         No of House Connections180
·         Funding: Government of Mauritius
·         Target date for completion: October 2016
·         Cost of Project: 63,756,839.36 (inclusive of VAT)
 

     13. House Connection Contracts – Port Louis, Baie Du Tombeau and Grand Baie

·         Region: Port Louis, Baie du Tombeau and Grand Baie
·         No of House Connections: 79
·         Funding: Government of Mauritius
·         Target date for implementation: Oct 2014
·         Cost of Project: MUR 24,849,959.26 (inclusive of VAT)
 

      14. House Connection Contract – Plaines Wilhems

·         Region: Plaines Wilhems
·         No of House Connections: 143
·         Funding: Government of Mauritius
·         Target date for implementation: Oct 2014
·         Cost of Project: MUR 24,992,405.64 (inclusive of VAT)
 

      15. Alfred Gellé St, Port Louis 15. Alfred Gellé St, Port Louis

·         Region(s): Alfred Gellé St
·         Length of Sewer: 115
·         No of House Connection: 26
·         Funding: Government of Mauritius
·         Status: 95% of works completed
·         Target date for completion: 11 September 2016
·         Cost of Project: MUR 5.045 million
 

      16. Highlands Sewerage Project

·         Region(s): Tout Court Road and Railway Road.
·         Length of Sewer: 2.4 km
·         No of House Connection: 200
·         Funding: Government of Mauritius
·         Status: Preparation of bidding document
·         Target date for start and completion:
·         Estimated Cost: CPB has given it approval to award the contract to Sotravic Ltée in the amount of MUR 135,166,312.46, excluding VAT.
 

     17. Kensington Place Sewerage Project 17. Kensington Place Sewerage Project

·         Region(s): Kensington Place, Petit Verger, Pointe Aux Sables.
·         Length of Sewer: 1.8 km with the Construction of 1 lifting Station.
·         No of House Connection: 110
·         Funding: Government of Mauritius
·         Status: Works in progress
·         Target date for start and completion: Start Date: 16 March 2017 Completion Date: 14 August 2018
·         Estimated Cost: MUR 73.9M (VAT incl.)
 

      18. CHA Phase IV – Rehabilitation Infrastructure at Residence La Cure, Port Louis

·         Region(s): Residence La Cure, Port Louis
·         Length of Sewer: 1700m
·         No of House Connections: 60
·         Funding: Government of Mauritius
·         Status: Bidding Stage
·         Target date for start and completion: 2017-2019
·         Estimated Cost: MUR 39.6M (VAT incl.)
 

       19.  CHA Phase IV – Rehabilitation Infrastructure at Residence Paul et Virginie, Port Louis

·         Region(s): Residence Paul & Virginie, Port Louis
·         Length of Sewer: 1700m
·         No of House Connections: 60
·         Funding: Government of Mauritius
·         Status: Bidding Stage
·         Estimated Cost: MUR 58 million (VAT Incl.)
·         Target date for start and completion: 2017- 2019
 

       20. Cipaye Brulée Sewerage Project20. Cipaye Brulée Sewerage Project

·         Region(s): Cipaye Brulée, Vallée des Prêtes
·         Length of Sewer: 2200m
·         No of House Connections: 125
·         Funding: Government of Mauritius
·         Status: Works in Progress
·         Target date for completion: April 2018
·         Cost of Project: -
 
21.  CHA Phase IV– Rehabilitation Infrastructure at Residence Palmerstone, Phoenix
·         Region(s): Palmerstone, Phoenix
·         Length of Sewer: 400m
·         No of House Connections: 80
·         Funding: Government of Mauritius
·         Status: Bidding Stage
·         Target date for implementation: 2017
·         Cost of Project: MUR 32.88 million
 
22.  Residence Rivière du Rempart
·         Region(s): Rivière du Rempart
·         Length of Sewer: 250m
·         No of House Connections: 75
·         Funding: Government of Mauritius
·         Status:Bids for Consultancy (Feasibility Study and Detailed Design) completed
·         Target date for implementation: -
·         Cost of Project: -